Hyderabad Metro Rail station SS railing installation — Sun Railings transit infrastructure case study
Home / Projects / Hyderabad Metro Rail

Infrastructure Case Study · Metro & Transit · Jeedimetla

Hyderabad Metro Rail
Station Railing Project

Delivered SS and glass station platform railing across all 46 Hyderabad Metro Rail stations. Coordinated with L&T Metro Rail programmes including Stations Stage-1 through Stage-6 and Uppal Depot handrail scope.

46 StationsSS & GlassL&T CoordinationPlatform RailingIS 875Pan-India Transit
46Metro stations in delivered programme scope
6L&T station stages coordinated
SS+GlassPlatform and circulation railing systems
L&TEPC contractor programme coordination
Project Overview

Programme Summary

Sun Railings supplied stainless steel and glass railing systems for the Hyderabad Metro Rail network — one of India’s largest urban transit infrastructure programmes. The scope covered station platform railing and handrail systems across all 46 stations, delivered in coordination with Larsen & Toubro (L&T) Metro Rail construction programmes including Stations Stage-1 through Stage-6 and the Uppal Depot.

Client / Project Context

Sector Requirements & Programme Background

Hyderabad Metro Rail operates high-traffic elevated and at-grade stations where platform edge safety, passenger circulation and visual openness are simultaneous programme requirements. Transit contractors and PMC teams specify railing systems that withstand daily metro usage, resist corrosion in open-air station environments, and integrate glass panels for station visibility without compromising barrier integrity.

Sun Railings contributed to L&T Metro Rail station handrail programmes across multiple construction stages. Portfolio evidence includes L&T Metro Rail – Stations’ Hand Rail – Stage-1, 2, 3, 4, 5, 6 and L&T Metro Rail – Uppal Depot from the company’s delivered project record. Factory fabrication at Jeedimetla Industrial Estate supported phased release aligned to station commissioning milestones.

46 StationsSS & GlassL&T CoordinationPlatform Railing
Hyderabad Metro Rail station platform railing — Sun Railings metro case study gallery
Hyderabad Metro Rail SS and glass station railing delivery — Sun Railings
Scope of Work

Systems & Zones Delivered

Drawing-based scope from consultant-approved specifications and contractor BOQ packages. The following zones and system types are documented in the Sun Railings Hyderabad Metro Rail project record.

Platform Edge Railing
SS structural members with glass infill panels along elevated and at-grade station platforms
Station Circulation Handrails
High-traffic circulation zones within station concourses and access corridors
Stage-Phased Delivery
Programme aligned to L&T Metro Rail station stages from Stage-1 through Stage-6
Depot Infrastructure
Handrail scope at Uppal Depot within the broader metro construction programme
Materials & Systems Used

Specification & Compliance

Railing systems were fabricated from high-quality stainless steel structural members with glass panel infill as documented in the Hyderabad Metro Rail portfolio. SS members are specified for corrosion resistance under daily metro usage. Glass panels provide station area visibility while maintaining platform edge barriers along high-traffic and elevated platform zones.

Compliance documentation aligned to IS 875 Part 2 structural requirements, IS 2553 glass certification where glass infill is specified, and NBC 2016 balustrade height confirmation. Mill test certificates and material test documentation are supplied for PMC and contractor handover on infrastructure programmes.

SS304 Structural MembersIS 2553 Toughened GlassIS 875 Load-RatedNBC 2016 HeightsCorrosion-Resistant FinishDrawing-Based Fab
Engineering & Installation Approach

Fabrication & Site Execution

Sun Railings operates as a factory-direct manufacturer at Jeedimetla Industrial Estate, Hyderabad since 2001. All structural members are fabricated in-house with coordinated site installation aligned to contractor and PMC programme milestones.

Drawing-Based Scope Review
Consultant and contractor drawings reviewed for load path, fixing detail and glass make-up before fabrication release at Jeedimetla.
Phased Station Delivery
Fabrication and site installation programmed to L&T Metro Rail station stage milestones — Stage-1 through Stage-6.
Factory QC
Incoming material inspection, weld checks and dimensional verification against approved drawings before site dispatch.
Site Coordination
Installation coordinated with transit contractor programmes at station platforms, concourses and depot infrastructure.
Compliance Handover
IS 875, IS 2553 and NBC documentation supplied for contractor and PMC submission at programme close.
Pan-India Transit Capability
Hyderabad fabrication base with site teams executing metro programmes across South India and nationwide.
Project Outcomes

Programme Results & Authority

The Hyderabad Metro Rail programme established glass and stainless steel railing across all 46 stations — setting a documented reference for urban transit safety and station design in Sun Railings infrastructure portfolio. Delivery spanned L&T-coordinated station stages and Uppal Depot, demonstrating capacity for large-scale, multi-stage transit infrastructure programmes from a single fabrication base.

For EPC contractors, metro developers and transit PMC teams evaluating platform railing suppliers, this programme provides named evidence of Hyderabad Metro Rail delivery at full network station scale.

Hyderabad Metro Rail station platform railing — Sun Railings metro case study gallery
Station platform SS
Hyderabad Metro Rail SS and glass station railing delivery — Sun Railings
Metro glass railing
Metro station platform railing contractor project — supporting transit infrastructure imagery
Transit contractor scope
Frequently Asked Questions

Hyderabad Metro Rail — Common Questions

What railing scope did Sun Railings deliver for Hyderabad Metro Rail?
SS and glass station platform railing and handrail systems across all 46 Hyderabad Metro Rail stations, coordinated with L&T Metro Rail programmes including Stations Stage-1 through Stage-6 and Uppal Depot.
Who was the EPC contractor for this metro railing programme?
Delivery was coordinated with Larsen & Toubro (L&T) Metro Rail construction programmes as documented in Sun Railings project portfolio and ongoing project records.
What materials were used for Hyderabad Metro station railing?
High-quality stainless steel structural members with glass panel infill, fabricated to consultant-approved drawings with IS 875 structural compliance and IS 2553 glass certification where applicable.
Does Sun Railings deliver metro railing outside Hyderabad?
Yes. Factory fabrication at Jeedimetla, Hyderabad with pan-India site execution. Portfolio includes Pune Metro Rail and Chennai Metro Rail station railing alongside Hyderabad Metro Rail.
What compliance documentation is supplied for metro infrastructure handover?
IS 875 Part 2 structural compliance statements, IS 2553 glass certification, NBC 2016 height confirmation, mill test certificates and as-built documentation on request for PMC submission.
How do transit contractors submit a metro railing project enquiry?
Contact Sun Railings with station scope, consultant drawings and programme timeline. Technical site assessment and drawing-based commercial project proposal after specification review.

Submit a Metro & Transit Railing Project Enquiry

Drawing-based commercial project proposals for commercial, institutional and infrastructure developments. Technical site visit within 24 hours. Factory at Jeedimetla, Hyderabad since 2001.

Send an Enquiry

Commercial and institutional project enquiries only