Home / Projects / Hyderabad Metro Rail

Infrastructure Case Study · Metro & Transit · Hyderabad, Telangana

Hyderabad Metro Rail
Station Railing Project

Handrail packages for Hyderabad Metro Rail across Stages 1–6, Uppal Depot and Miyapur Depot, carried out through L&T Construction.

L&T Construction2013–2021Mild Steel + Stainless Steel
2013–2021Period
6Station stages
2Depots: Uppal and Miyapur
L&TContracting party
At a Glance

Project Facts
  • Contracting party: L&T Construction
  • Location: Hyderabad, Telangana
  • Period: 2013–2021
  • Scope: station handrails at platform and concourse levels, entry and exit points, internal staircases, escalator and staircase surrounds, and toilet ramps; Stages 1–6 plus Uppal Depot and Miyapur Depot
  • Materials: mild steel and stainless steel in combination, with glass railing at some locations
  • Record: L&T work orders, package references and site correspondence

Prepared by: Sunil Kumar, Managing Director, Sun Corporation Fabricators & Engineers, from Sun Corporation’s project records, L&T work orders and the L&T package references held on file. Last reviewed October 2026.

Project Overview

Programme Summary

Sun Corporation Fabricators & Engineers, trading as Sun Railings, carried out handrail work for Hyderabad Metro Rail through L&T Construction between 2013 and 2021. The work covers station handrails at platform level and concourse level, entry and exit points, internal staircases, escalator and staircase surrounds, and toilet ramps, across the Stage 1–6 stations and the Uppal and Miyapur depots. The railings combine mild steel and stainless steel, with glass railing at some locations. L&T work orders record fabrication, erection and handing over of handrails and entry and exit structures for the Stage 5 stations, and site fit-up and welding of stainless steel and mild steel railings for Stage 6. Package references are listed in the table below.

Scope of Work

Stages & Depots Covered
Stages 1–6
Stage references recorded with L&T Construction.
Uppal Depot and Miyapur Depot
Depot references within the same programme.

Programme Packages

Job codes are L&T package references. Miyapur Depot: package reference not recorded.

Package L&T job code
Miyapur Depot Not recorded
Uppal Depot LE120359
Stations’ Hand Rail — Stage 1 LE120560
Stations’ Hand Rail — Stage 2 LE120565
Stations’ Hand Rail — Stage 3 LE130125
Stations’ Hand Rail — Stage 4 LE130126
Stations’ Hand Rail — Stage 5 LE130127
Stations’ Hand Rail — Stage 6 LE130128
Materials & Documentation

What Was Used

Railings combine mild steel and stainless steel as specified for each package, with glass railing at some locations. Material test certificates and project documentation were supplied where the contract required them.

Mild SteelStainless SteelGlass at some locations
Delivery

Site Execution & Record

Site work followed the L&T station programme.

  • Handrail packages for six station stages and two depots.
  • All work through one contracting party, L&T Construction.
  • Each package recorded against an L&T job code.
Frequently Asked Questions

Hyderabad Metro Rail — Common Questions

What was the scope?
Station handrails at platform and concourse levels, entry and exit points, internal staircases, escalator and staircase surrounds and toilet ramps, across Stages 1–6 and the two depots.
Who was the contracting party?
L&T Construction.
What materials were used?
Mild steel and stainless steel in combination, with glass railing at some locations.
When was the work carried out?
Between 2013 and 2021, as recorded in L&T letters of intent, work orders and site correspondence.

Planning a Metro & Transit Project?

Share your drawings or project requirements for technical review and manufacturing consultation.

Request Consultation

Share your drawings or project requirements for technical review and manufacturing consultation.