Metro Station Railing Manufacturer India — Platform, Staircase & Walkway Railing for Metro Rail Projects
Metro station railing must withstand 3.0 kN per metre crowd load — three times the residential standard. Sun Railings is an approved metro railing supplier having completed platform, staircase and concourse railing at 40+ L&T Metro Rail Hyderabad stations, with IS 875 heavy-duty structural certification on every installation.
Metro railing is in a different category from residential — the structural load requirements are three times higher because of crowd pressure, the finishes have to withstand daily heavy use, and the IS 875 documentation has to be stamped and signed before a single piece goes on site. We completed 40+ L&T Metro Rail Hyderabad stations and we know exactly what HMRL specification looks like. Every piece is fabricated at our Jeedimetla factory to the same standard. If you're tendering for a metro project, call us early — lead time planning is everything on infrastructure contracts.
Metro elevated walkway railing — SS304 heavy-duty, IS 875 crowd load certified
Why Sun Railings?
Own factory since 2001
Jeedimetla, Hyderabad. Direct manufacturing. 15 to 20 percent lower cost with better quality control than dealers.
IS documents included
IS 875, IS 2553, NBC 2016 certificates and GHMC-format drawings included with every project. No extra charge.
500+ projects across India
Bhogapuram Airport, GMR Airport, L&T Metro, AIIMS Guntur, IIT Hyderabad, IKEA. 4.8 stars Google rating.
Technical Specifications
| Material | SS304 or SS316 marine grade |
| Glass type | Toughened safety glass IS 2553 |
| Glass thickness | 12mm standard |
| Railing height | 1050mm min NBC 2016 |
| Lateral load | 200 kg per m IS 2553 |
| Finish | Satin, mirror, PVD black, PVD gold |
| Compliance | IS 2553, IS 875, NBC 2016, GHMC |
| Warranty | 5 years structural |
Metro staircase railing — IS 875 structural grade, SS304 satin finish
Transit hub concourse railing — multi-floor SS304 installation, IS 875 heavy-duty
Frequently Asked Questions
Free Site Visit — Fixed Price Quote
Our engineer visits within 24 hours and delivers a written fixed-price quotation within 48 hours. No hidden charges. 5-year structural warranty.
Plot 14, Phase III, Jeedimetla Industrial Area, Hyderabad 500055
Related Products
Related Project: Hyderabad Metro Rail case study